Military Modular Buildings & Housing Solutions

Temporary Military Housing and Support Facilities, Ready When the Mission Moves

A ship crew may need berthing at the pier while its vessel is in for maintenance. A military installation may need permanent barracks. Gulf Land Structures handles both, from outfitting barges with living quarters to building three-story volumetric modular barracks and dormitories.

Gulf Land also delivers accommodation camps and specialty buildings for defense programs. Past work includes camps for a military shipbuilding program and ABS- and USCG-certified blast-resistant buildings for high-hazard sites.

Site preparation can proceed while Gulf Land completes roughly 90 percent of the building work at its 120,000-square-foot plant in Lafayette, Louisiana. Buildings travel by truck, barge, or roll-on/roll-off vessel, depending on the site. The same company that builds the facilities sets and connects them on site and maintains them in service.

Find the Right Buildings for Your Military Installation

Start with the number of personnel you need to house and how long they’ll be there. The site determines how much room you have for buildings and what utilities are available.

Permanent Modular Barracks & Dormitories

Three-story volumetric modular residential buildings with flat roof assemblies and architectural panel exteriors. Modules are finished at the plant and set on site.

Temporary Barracks & Sleeper Buildings

Each 11-by-36-foot fiberglass building sleeps 12 in two bedrooms. The shared bathroom area has two showers, two sinks, and two toilets. Buildings can stack two stories high with an exterior stair.

Temporary Berthing Facilities

Berthing modules and barge-mounted living quarters give ship crews a place to stay at the pier during maintenance and repairs.

Galley, Dining & Hygiene Buildings

Galleys and food prep buildings come with commercial stainless steel equipment. Dining modules seat 32. Options also include laundries and 40-foot shower buildings with up to 16 showers per unit. ADA-accessible versions are available.

Blast-Resistant & Specialty Buildings

Options include ABS- and USCG-certified steel modules verified to 5 psi. Gulf Land also offers A-60 fire-rated construction and builds pressurized facilities to applicable Class I, Division 2 and NFPA 496 Type Z requirements. Applications include control rooms and command centers, as well as buildings for hazardous areas.

Rental Buildings & Equipment

Choose from more than 220 rental buildings for short-term requirements. Equipment includes generators, reverse osmosis water makers, potable water tanks, and wastewater treatment systems.

Supporting Personnel Across Military & Defense Sites

From barracks swing space to crew berthing at the pier, Gulf Land provides space for personnel to live and work.

1-permanent_barracks_A

Military Installations

Temporary housing within the installation keeps personnel on base while barracks are renovated or new quarters are built.

2-temporary_barracks_B

Shipyards & Ship Repair

Dockside berthing, offices, and support buildings for shipbuilding programs and ship maintenance.

3-temporary_berthing_B

Defense Program Support

Accommodation camps for contractors and program personnel working at or near the installation.

4-galley_dining_hygiene_B

Remote & Overseas Sites

Self-contained camps with power, water, and wastewater treatment for sites without local utilities.

5-blast_resistant_specialty_B

Mobilizations & Exercises

Rental housing, dining, and hygiene facilities for mobilizations and exercises, including when personnel numbers rise for a short period.

6-rental_buildings_equipment_B

Hazardous Areas

Blast-resistant and A-60 fire-rated construction, with pressurized building options for operations near fuel storage, process areas, and other hazardous locations.

Expertise in Military Housing & Deployable Facilities

Accommodation Camps for Sites With Limited Space

When a site has too little room for a single-level camp, stacking modules can make the layout work. Gulf Land used that approach for two accommodation camps supporting a military shipbuilding program in Jacksonville, Florida. Each camp served a different prime contractor.

Both camps connected to local utilities. The sleeper buildings were built to a standard accepted for long-term occupancy, with fit and finish equivalent to site-built construction.

Crew Berthing Close to the Ship

Barge-mounted living quarters give crews a place to stay near their ship during maintenance. Gulf Land has outfitted berthing barges on both the East and West Coasts.

Modules leave the Lafayette plant with sleeping rooms, bathrooms, and support spaces already outfitted. Gulf Land ships the modules and sets them on the barge. Galley and dining facilities can also be built so crews can eat at the pier.

Permanent Barracks and Dormitories

Site crews can build foundations and install utilities while Gulf Land fabricates the modules. The first finished module comes off the line about 16 to 17 weeks after design release. Production then runs at about 24,000 square feet per month.

Gulf Land builds three-story volumetric modular residential buildings with flat roof assemblies and architectural panel exteriors. Each module leaves the plant with interior walls and bathrooms in place. Mechanical, electrical, and plumbing systems are installed and inspected before shipment.

Gulf Land has experience on projects performed under UFC, Davis-Bacon, Buy American, and Miller Act requirements.

Storm Readiness and Site Restoration

Gulf Land engineers its modules to Miami-Dade High Velocity Hurricane Zone criteria. Its rental fleet is approved for wind speeds up to 175 mph when installed and anchored under the applicable approval conditions.

Adjustable pier footings let buildings sit on site without a fixed concrete pad. Ground screws or duckbill anchors secure the buildings, and utilities use quick connections. When the assignment ends, demobilization and site restoration can take weeks.

From Design to Deployment

Gulf Land handles the modular scope from initial layout through camp operations, giving prime contractors one point of accountability for that work.

Design & Engineering

Head count, site conditions, and installation requirements guide building layouts. Gulf Land handles structural engineering as well as mechanical, electrical, and plumbing design.

Fabrication & Outfitting

Our Lafayette plant builds and outfits about 24,000 square feet of finished building per month, or roughly 50 modules. Every module is inspected before shipment.

Delivery & Installation

Most Gulf Coast and Southeast installations are a day’s haul from Lafayette. Barge and ocean freight serve waterfront and overseas sites. At the installation, Gulf Land crews set the buildings, connect utilities, and commission the facilities.

Camp Operations & Maintenance

Gulf Land’s certified in-house technicians handle HVAC and refrigeration service, electrical work, plumbing, and carpentry. Maintenance support includes 24-hour response.

Why Partner With Gulf Land Structures?

Gulf Land has built, delivered, and operated workforce housing since 2007. Prime contractors can rely on the same company to install the buildings and keep them running. Gulf Land is also a small business and can help primes meet their small business participation goals.

130+ Years

Combined Living Quarters Experience

120,000 Sq. Ft.

Manufacturing Complex

24,000 Sq. Ft.

Monthly Output of Finished Buildings

220+

Rental Buildings

Military Modular Building FAQ

What Are Military Modular Buildings?

Military modular buildings are factory-built facilities for uses ranging from barracks and dining halls to offices and other support spaces. They arrive outfitted and ready to set and connect at the installation. Relocatable units can move when the assignment ends. Permanent buildings can remain in long-term service.

How Quickly Can Temporary Military Housing Be Deployed?

Buildings from the existing rental fleet can deploy ahead of new production. For new buildings, the first finished module comes off the line about 16 to 17 weeks after design release. Fabrication can proceed while crews prepare the site. Gulf Land provides a project schedule from notice to proceed.

Can Modular Barracks Be Stacked?

Yes, Gulf Land’s sleeper buildings can stack two stories high with an exterior stair and landing. That layout has allowed camps to fit on sites with too little room for a single-level setup.

What If the Site Has No Utilities?

Gulf Land can package power generation with reverse osmosis systems for producing potable water, plus water storage and pressure systems. The package also includes wastewater treatment, so the camp can operate before local utilities are extended or at a site without utility service.

Does Gulf Land Work as a Subcontractor to Prime Contractors?

Yes, Gulf Land regularly supports prime contractors by handling the modular scope directly, from fabrication and delivery to installation and maintenance.

gulf-land-zigzag-divider-original

request a quote

WHAT DOES YOUR PROJECT NEED?

Tell us how many personnel need housing, where the installation is located, and when the buildings need to be ready. Our team will follow up to discuss your requirements.